4.12.2009

Half Bathroom Progress


The half bathroom work began when we were just going to have the toilet replaced. We figured we could get a new toilet to replace the old one, and mess with the wallpaper and junk later. Once the old one was out, we look in the box and saw the new one was chipped. So, while we had the room, might as well redo the whole bathroom, right?

So here's my husband putting the new low flow toilet with this long and dainty wrench. It's so cute, it looks like a magic wand.

I spent hours and hours on the floor dying all that grout, and I picked a light gray for the walls. The last thing we have to do is to replace the old faucet. So, yay, we finally have two bathrooms.

No comments:

Post a Comment